Bay Area Sewer Compliance Directory
Grants • Loans • Point-of-Sale Ordinances • Escrow Rules • Governing Agencies
All Bay Area cities and communities — grants, loans, POS ordinances, and escrow rules. Click any county to expand, then the district, then the city.
Why these programs exist: Private sewer-lateral requirements are intended to reduce infiltration and inflow, prevent sanitary sewer overflows, and keep groundwater and stormwater from entering the sanitary collection system. The purpose is common across agencies; the triggers, testing methods, deadlines, and financial-assistance rules vary by jurisdiction.
102 cities and districts across 7 counties
Alameda County 16 cities ▼
Alameda ◯ Negotiable / deposit option ⚡ Apply before work 📋 EBMUD PSL 📜 Ordinance Gas Shutoff Valve ▼
PSL compliance certificate required at sale , permit >$100k , or water meter size change .
- EBMUD PSL compliance certificate required
- Three triggers: (1) Sale/transfer of property, (2) Remodel/building permit >$100,000, (3) Any change in water meter size — increasing or decreasing the meter triggers sewer lateral compliance — any one triggers compliance
- Alameda: upper lateral only (from building to property line / curbside cleanout)
- No public grant or loan program available
- (1) Sale or transfer of property (escrow)
- (2) Building or remodeling permit valued over $100,000
- (3) Any change in water meter size — increasing or decreasing the meter triggers sewer lateral compliance — any one of these three events triggers the compliance requirement
- Alameda and Albany: upper lateral only (building to curbside cleanout). All other EBMUD cities: full lateral (upper and lower, building to public sewer main)
- Voluntary compliance also available at any time
- IMPORTANT: Large property deadline — campus/business parks with >1,000 ft of laterals must comply by July 12 2026
- SYSTEM UPDATE: EBMUD still lists the Accela transition as upcoming for summer 2026. Check the official EBMUD PSL page and eastbaypsl.com before scheduling, paying, or requesting certification.
◯ Negotiable / deposit option
Remodel threshold: No separate dollar threshold listed; applies at property sale and qualifying gas-permit work.
Albany ◯ Negotiable / deposit option ⚡ Apply before work 📋 EBMUD PSL 📜 Ordinance ▼
PSL compliance certificate required at sale , permit >$100k , or water meter size change .
- Three triggers: (1) Sale/transfer, (2) Remodel/permit >$100,000, (3) Any change in water meter size — increasing or decreasing the meter triggers sewer lateral compliance
- Albany: upper lateral only (from building to property line / curbside cleanout)
- No public grant or loan available
- (1) Sale or transfer of property (escrow)
- (2) Building or remodeling permit valued over $100,000
- (3) Any change in water meter size — increasing or decreasing the meter triggers sewer lateral compliance — any one of these three events triggers the compliance requirement
- Alameda and Albany: upper lateral only (building to curbside cleanout). All other EBMUD cities: full lateral (upper and lower, building to public sewer main)
- Voluntary compliance also available at any time
- IMPORTANT: Large property deadline — campus/business parks with >1,000 ft of laterals must comply by July 12 2026
- SYSTEM UPDATE: EBMUD still lists the Accela transition as upcoming for summer 2026. Check the official EBMUD PSL page and eastbaypsl.com before scheduling, paying, or requesting certification.
◯ Negotiable / deposit option
Berkeley ◯ Negotiable / deposit option ⚡ Apply before work 💰 Loan 📜 Ordinance Gas Shutoff Valve ▼
- Berkeley PSL loan: low-income owners only, and only where City has found the lateral a public nuisance — not a general-public loan
- EBMUD PSL compliance certificate also required
- Verify current city loan rules
- (1) Sale or transfer of property
- (2) Building permit for construction or remodeling valued over $60,000
- (3) City finds that the PSL may be a public nuisance
- (4) Property owner voluntarily elects to repair or replace PSL
- Note: Berkeley manages its own independent program — NOT the EBMUD regional program. Any increase or decrease in water meter size is an EBMUD trigger, not a separate Berkeley trigger.
◯ Negotiable / deposit option
Remodel threshold: No single dollar threshold listed; applies to qualifying permitted construction or remodel work.
Castro Valley (CVSan) ◯ Negotiable / deposit option ⚡ Apply before work ✔ Grant 📜 Ordinance ▼
- Applicant must meet the program’s income-assistance eligibility requirements
- Three quotes from CVSan-qualified contractors are required before approval
- CVSan-witnessed video inspection and written authorization are required before work begins
- Approved work must generally be completed within 90 days and no later than June 30, 2027
- Funding is first-qualified, first-served and subject to the FY 2026–27 allocation
- Program eligibility is determined by CVSan after its required inspection and application review
- No POS ordinance requiring all property sales to test
◯ Negotiable / deposit option
Dublin — No Program ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
Emeryville ◯ Negotiable / deposit option ⚡ Apply before work 📋 EBMUD PSL 📜 Ordinance ▼
PSL compliance certificate required at sale , permit >$100k , or water meter size change .
- Three triggers: (1) Sale/transfer of property, (2) Remodel/building permit >$100,000, (3) Any change in water meter size — increasing or decreasing the meter triggers sewer lateral compliance
- Full lateral required (upper + lower) — entire pipe from building to public sewer main
- No public grant or loan available
- (1) Sale or transfer of property (escrow)
- (2) Building or remodeling permit valued over $100,000
- (3) Any change in water meter size — increasing or decreasing the meter triggers sewer lateral compliance — any one of these three events triggers the compliance requirement
- Alameda and Albany: upper lateral only (building to curbside cleanout). All other EBMUD cities: full lateral (upper and lower, building to public sewer main)
- Voluntary compliance also available at any time
- IMPORTANT: Large property deadline — campus/business parks with >1,000 ft of laterals must comply by July 12 2026
- SYSTEM UPDATE: EBMUD still lists the Accela transition as upcoming for summer 2026. Check the official EBMUD PSL page and eastbaypsl.com before scheduling, paying, or requesting certification.
◯ Negotiable / deposit option
Fremont — No Program Sidewalk ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
Hayward — No Program ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
- Sewer agency varies by address — verify before any work
Livermore — No Program Sidewalk ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
Newark — No Program ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
Oakland ◯ Negotiable / deposit option ⚡ Apply before work 📋 EBMUD PSL 📜 Ordinance Sidewalk ▼
PSL compliance certificate required at sale , permit >$100k , or water meter size change .
- Three triggers: (1) Sale/transfer, (2) Remodel/building permit >$100,000, (3) Any change in water meter size — increasing or decreasing the meter triggers sewer lateral compliance
- Full lateral required (upper + lower) — entire pipe from building to public sewer main
- No public grant or loan available
- (1) Sale or transfer of property (escrow)
- (2) Building or remodeling permit valued over $100,000
- (3) Any change in water meter size — increasing or decreasing the meter triggers sewer lateral compliance — any one of these three events triggers the compliance requirement
- Alameda and Albany: upper lateral only (building to curbside cleanout). All other EBMUD cities: full lateral (upper and lower, building to public sewer main)
- Voluntary compliance also available at any time
- IMPORTANT: Large property deadline — campus/business parks with >1,000 ft of laterals must comply by July 12 2026
- SYSTEM UPDATE: EBMUD still lists the Accela transition as upcoming for summer 2026. Check the official EBMUD PSL page and eastbaypsl.com before scheduling, paying, or requesting certification.
◯ Negotiable / deposit option
Piedmont ◯ Negotiable / deposit option ⚡ Apply before work 📋 EBMUD PSL 📜 Ordinance ▼
PSL compliance certificate required at sale , permit >$100k , or water meter size change .
- Three triggers: (1) Sale/transfer, (2) Remodel/building permit >$100,000, (3) Any change in water meter size — increasing or decreasing the meter triggers sewer lateral compliance
- Full lateral required (upper + lower)
- No public grant or loan available
- (1) Sale or transfer of property (escrow)
- (2) Building or remodeling permit valued over $100,000
- (3) Any change in water meter size — increasing or decreasing the meter triggers sewer lateral compliance — any one of these three events triggers the compliance requirement
- Alameda and Albany: upper lateral only (building to curbside cleanout). All other EBMUD cities: full lateral (upper and lower, building to public sewer main)
- Voluntary compliance also available at any time
- IMPORTANT: Large property deadline — campus/business parks with >1,000 ft of laterals must comply by July 12 2026
- SYSTEM UPDATE: EBMUD still lists the Accela transition as upcoming for summer 2026. Check the official EBMUD PSL page and eastbaypsl.com before scheduling, paying, or requesting certification.
◯ Negotiable / deposit option
Pleasanton — No Program ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
- Verify whether DSRSD or city serves your address
San Leandro — No Program Gas Shutoff Valve ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
- Sewer agency may vary by address
Remodel threshold: $5,000 or more.
San Lorenzo / Ashland / Cherryland / Fairview (Oro Loma SD) Proposed Program ▼
CURRENT UPDATE: Oro Loma has not yet implemented an active point-of-sale ordinance. The District says the implementation schedule and ordinance are still under development, with adoption projected for August 2026.
- Properties being sold are expected to require sewer lateral inspection before escrow closes once the program is adopted.
- Proposed inspections include both CCTV inspection and pressure testing.
- Deficiencies identified during inspection would need to be corrected to District Standards and inspected by the District.
- No active point-of-sale effective date, adopted ordinance number, fee schedule, certificate-validity period, or grant program is currently posted by the District.
- Verify the property is within Oro Loma's service area before relying on these requirements.
Union City — No Program ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
Contra Costa County 29 cities ▼
Alamo / Blackhawk / Diablo (unincorporated Central San area) 💰 Loan Gas Shutoff Valve ▼
- Central San has NO point-of-sale sewer lateral inspection ordinance — confirmed on their FAQ
- Central San Lateral Replacement Financing Program available for eligible properties
- Unincorporated communities: Alamo, Blackhawk, Diablo, Canyon, Clyde, Pacheco also served by Central San
- Address verification required — Central San serves 13 cities/towns and surrounding unincorporated areas
- Contact Central San: (925) 229-7371
Remodel threshold: $5,000 when gas work is involved; $15,000 for other qualifying remodel work.
Antioch — No Program ▼
No public grant, loan, or financing program was identified. Delta Diablo states that it does not require sewer-lateral certification solely because a property is sold. Permits remain required for applicable connection, repair, or replacement work.
Bay Point Unincorporated — No Program Gas Shutoff Valve ▼
No public grant, loan, or financing program was identified. Delta Diablo states that it does not require sewer-lateral certification solely because a property is sold. Permits remain required for applicable connection, repair, or replacement work.
- Delta Diablo explicitly states: NO sewer lateral certification required for property sales
- Property owner is responsible for the entire sewer lateral from the building to the public sewer main, including the connection tap or wye
- Condition assessments are the homeowner's responsibility
- For permits: contact Delta Diablo at permits@deltadiablo.org or use the Citizen Self-Service System
Remodel threshold: $5,000 when gas work is involved; $15,000 for other qualifying remodel work.
County Requirements
This community is an unincorporated area governed primarily by Contra Costa County. Property compliance requirements may be administered by the County and the applicable sewer or sanitary district rather than by a city government.
Bethel Island — No Program Gas Shutoff Valve ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
- Same ISD requirements as Oakley — Ironhouse Sanitary District serves both Oakley and Bethel Island
- No confirmed POS inspection requirement at sale — verify current status with ISD
- Property owner responsible for entire lateral from home to public main connection
- Ironhouse permit required for lateral work — contact (925) 625-2279
- Note: Bethel Island has additional flood/levee jurisdiction under BIMID (Bethel Island Municipal Improvement District)
Remodel threshold: $5,000 when gas work is involved; $15,000 for other qualifying remodel work.
Brentwood — No Program Gas Shutoff Valve ▼
No public grant, loan, or financing program or citywide point-of-sale certificate requirement was identified. For typical single-family homes, the owner maintains the upper lateral to the property line/cleanout, while the City maintains the lower portion from the property line/cleanout to the public main under its residential maintenance program. Verify responsibility for commercial and nonstandard properties.
Remodel threshold: No dollar amount confirmed in the current directory; applies to qualifying alterations and gas-permit work.
Clayton 💰 Loan Gas Shutoff Valve ▼
- Wastewater collection in Clayton is performed by the City of Concord — not Central San directly
- Concord conveys Clayton wastewater to Central San's treatment plant
- Central San has NO point-of-sale ordinance — inspection is encouraged but not required
- Central San Lateral Replacement Financing Program available for eligible properties
- For permits and lateral work in Clayton: contact City of Concord Public Works (925) 671-3448
Remodel threshold: $5,000 when gas work is involved; $15,000 for other qualifying remodel work.
Concord ◯ Negotiable / deposit option ⚡ Apply before work ✔ Grant 💰 Loan 📜 Ordinance Gas Shutoff Valve ▼
- Address determines which agency and program applies
- Central San: financing repaid through property tax
- CVSan grant: 3 quotes, qualified contractor, apply first
- Lateral replacement needed
- Financing application before construction
◯ Negotiable / deposit option
Remodel threshold: Amount requires confirmation with the Building Division.
Crockett Unincorporated ✖ Must complete before close 📜 Ordinance Gas Shutoff Valve ▼
- CCSD Ordinance No. 07-1 (2007): Certificate of Compliance required prior to sale of property
- CCTV inspection required — DVD/electronic file must be submitted to District for review
- Any sewer lateral deficiencies identified must be corrected before certificate is issued
- Contact: Crockett Community Services District (510) 787-2992
- Also covers: Port Costa (same district and ordinance)
- (1) Transfer of title / sale of property
- (2) Major building permit
✖ Must complete before close
Remodel threshold: $5,000 when gas work is involved; $15,000 for other qualifying remodel work.
County Requirements
This community is an unincorporated area governed primarily by Contra Costa County. Property compliance requirements may be administered by the County and the applicable sewer or sanitary district rather than by a city government.
Danville ◯ Negotiable / deposit option ⚡ Apply before work 💰 Loan 📜 Ordinance ▼
- Eligible for lateral replacement or shared lateral
- Repaid through annual property tax bill
- Verify current dollar limit with Central San
- Lateral replacement needed
- Financing application before construction
◯ Negotiable / deposit option
El Cerrito ◯ Negotiable / deposit option ⚡ Apply before work 💰 Loan 📜 Ordinance ▼
- Stege loan application required
- EBMUD PSL compliance also required — three triggers: (1) Sale/transfer, (2) Remodel/permit >$100,000, (3) Any change in water meter size — increasing or decreasing the meter triggers sewer lateral compliance
- Full lateral (upper + lower) required
- Repayment up to 10 years via property tax
- (1) Sale or transfer of property
- (2) Remodeling/building permit over $100,000
- (3) Any change in water meter size — increasing or decreasing the meter triggers sewer lateral compliance — EBMUD PSL ordinance governs, same three triggers as main EBMUD program
- Stege no-interest loan (up to $10,000) available to help cover compliance costs
◯ Negotiable / deposit option
El Sobrante Unincorporated ◯ Negotiable / deposit option ⚡ Apply before work ✔ Grant 📜 Ordinance Gas Shutoff Valve ▼
- Certificate of Compliance required for property transfer in the WCW service area
- Must be in WCWD service area
- CCTV inspection and contractor estimates required
- Funding subject to annual availability
- Lateral fails inspection or is scheduled for replacement
- Pre-approval required before any work begins
◯ Negotiable / deposit option
Remodel threshold: $5,000 when gas work is involved; $15,000 for other qualifying remodel work.
County Requirements
This community is an unincorporated area governed primarily by Contra Costa County. Property compliance requirements may be administered by the County and the applicable sewer or sanitary district rather than by a city government.
Hercules ◯ Negotiable / deposit option ⚡ Apply before work ✔ Grant 📜 Ordinance Gas Shutoff Valve ▼
- Certificate of Compliance required for property transfer in the WCW service area
- Must be in WCWD service area
- CCTV inspection and estimates required
- Lateral fails inspection or is scheduled for replacement
- Pre-approval required before any work begins
◯ Negotiable / deposit option
Remodel threshold: Amount requires confirmation under the city’s adopted Contra Costa County ordinance.
Kensington Unincorporated ◯ Negotiable / deposit option ⚡ Apply before work 💰 Loan 📜 Ordinance Gas Shutoff Valve ▼
- Stege loan application required
- EBMUD PSL compliance also required — three triggers: (1) Sale/transfer, (2) Remodel/permit >$100,000, (3) Any change in water meter size — increasing or decreasing the meter triggers sewer lateral compliance
- Full lateral (upper + lower) required
- Repayment up to 10 years via property tax
- (1) Sale or transfer of property
- (2) Remodeling/building permit over $100,000
- (3) Any change in water meter size — increasing or decreasing the meter triggers sewer lateral compliance — EBMUD PSL ordinance governs, same three triggers as main EBMUD program
- Stege no-interest loan (up to $10,000) available to help cover compliance costs
◯ Negotiable / deposit option
Remodel threshold: $5,000 when gas work is involved; $15,000 for other qualifying remodel work.
County Requirements
This community is an unincorporated area governed primarily by Contra Costa County. Property compliance requirements may be administered by the County and the applicable sewer or sanitary district rather than by a city government.
Lafayette ◯ Negotiable / deposit option ⚡ Apply before work 💰 Loan 📜 Ordinance Gas Shutoff Valve ▼
- Eligible replacement or shared lateral
- Repaid through annual property tax bill
- Lateral replacement needed
- Financing application before construction
◯ Negotiable / deposit option
Remodel threshold: Any gas-piping project; $15,000 for other qualifying remodel work.
Martinez ◯ Negotiable / deposit option ⚡ Apply before work 💰 Loan 📜 Ordinance Gas Shutoff Valve ▼
- Central San serves most of Martinez — verify your address
- Repaid through annual property tax bill
- Lateral replacement needed
- Financing application before construction
◯ Negotiable / deposit option
Remodel threshold: $10,000 for qualifying additions or alterations.
Martinez (MVSD area — northeast portion) — No Program ▼
Martinez is served by TWO districts — MVSD covers the northeast portion, Central San covers other areas. Verify your specific address at mvsd.org or (925) 228-5635 before assuming which district applies.
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
- MVSD serves the northeasterly portion of the City of Martinez and adjacent unincorporated areas — 4.7 sq mile service area
- MVSD does NOT own or maintain side sewers — property owner is responsible from home to point of connection with public main
- No confirmed POS inspection requirement at sale — verify with MVSD at (925) 228-5635
- Permit required for any lateral repair or replacement — licensed/bonded underground contractor required
- $1,000 bond/deposit required plus application fee ($211.20) and inspection fee ($235.20) = $1,446.40 total for long repair permit
- NOTE: The City of Martinez is split between MVSD (northeast) and Central San (other portions) — verify your specific address
Moraga ◯ Negotiable / deposit option ⚡ Apply before work 💰 Loan 📜 Ordinance Gas Shutoff Valve ▼
- Eligible replacement or shared lateral
- Repaid through annual property tax bill
- Lateral replacement needed
- Financing application before construction
◯ Negotiable / deposit option
Remodel threshold: $5,000 when gas work is involved; $50,000 for other qualifying remodel work.
Oakley — No Program ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
- Ironhouse Sanitary District has a Private Sewer Lateral Replacement Program (Ordinance No. 65)
- No confirmed POS inspection requirement at sale — verify current status with ISD
- Property owner is responsible for entire sewer lateral from home to connection with public main
- Ironhouse permit required for any lateral construction, connection, or repair
- All plans for private sewer work must be supplied to District engineer for review prior to work
- Contact Ironhouse Sanitary District: (925) 625-2279
Orinda ◯ Negotiable / deposit option ⚡ Apply before work 💰 Loan 📜 Ordinance Gas Shutoff Valve ▼
- Eligible replacement or shared lateral
- Repaid through annual property tax bill
- Lateral replacement needed
- Financing application before construction
◯ Negotiable / deposit option
Remodel threshold: $5,000 when gas work is involved; $50,000 for other qualifying remodel work.
Pinole (City Service Area) ◯ Negotiable / deposit option ⚡ Apply before work ✔ Grant 📜 Ordinance Gas Shutoff Valve ▼
- Certificate of Compliance required for property transfer in the WCW service area
- Must be in WCWD service area
- CCTV inspection and estimates required
- Lateral fails inspection or is scheduled for replacement
- Pre-approval required before any work begins
◯ Negotiable / deposit option
Remodel threshold: $5,000 when gas piping is involved; $50,000 when it is not.
Pinole (West County Wastewater Service Area) ◯ Negotiable / deposit option ⚡ Apply before work ✔ Grant 📜 Ordinance Gas Shutoff Valve ▼
- Certificate of Compliance required for property transfer in the WCW service area
- Must be in WCWD service area
- CCTV inspection and estimates required
- Lateral fails inspection or is scheduled for replacement
- Pre-approval required before any work begins
◯ Negotiable / deposit option
Remodel threshold: $5,000 when gas piping is involved; $50,000 when it is not.
Pittsburg — No Program Gas Shutoff Valve ▼
No public grant, loan, or financing program was identified. Delta Diablo states that it does not require sewer-lateral certification solely because a property is sold. Permits remain required for applicable connection, repair, or replacement work.
Remodel threshold: $5,000 when gas work is involved; $50,000 for other qualifying remodel work.
Pleasant Hill ◯ Negotiable / deposit option ⚡ Apply before work 💰 Loan 📜 Ordinance Gas Shutoff Valve ▼
- Eligible replacement or shared lateral
- Repaid through annual property tax bill
- Lateral replacement needed
- Financing application before construction
◯ Negotiable / deposit option
Remodel threshold: $40,000 or more for qualifying additions or alterations; gas-piping permits also trigger the requirement.
Port Costa Unincorporated ⚠ Verify directly 📜 Ordinance Gas Shutoff Valve ▼
Port Costa has a separate sanitary system and should not automatically be treated as subject to Crockett Ordinance No. 07-1. Contact the Port Costa Sanitary Department for current, property-specific transfer, inspection, permit, and certificate requirements before advising a buyer or seller.
Remodel threshold: $5,000 when gas work is involved; $15,000 for other qualifying remodel work.
County Requirements
This community is an unincorporated area governed primarily by Contra Costa County. Property compliance requirements may be administered by the County and the applicable sewer or sanitary district rather than by a city government.
Richmond ✔ Grant 🏠 POS ▼
Reimbursement program — complete the work first, then apply. Do not apply before starting work.
- Property must be in Richmond MSD
- Full lateral replacement only — no partial repairs
- Proof of payment required
- No prior reimbursement received
- Work completed during current fiscal year
Richmond — West County service area ⚡ Apply before work ✔ Grant 📜 District requirements ▼
Richmond is served by more than one sewer agency. This tab applies only to Richmond properties located within the West County Wastewater service area. Verify the sewer district by address before relying on the program.
- Property must be within the West County Wastewater service area
- Verify jurisdiction by property address
- CCTV inspection and contractor estimates may be required
- Obtain WCWD approval before beginning work
Richmond Annex ◯ Negotiable / deposit option ⚡ Apply before work ✔ Grant 💰 Loan 📜 Ordinance ▼
Address-level verification required — jurisdiction determines which program applies.
- Certificate of Compliance required for property transfer in the WCW service area
- May be in Stege, Richmond MSD, or WCWD — verify address before assuming any program applies
- EBMUD PSL compliance also required — three triggers: (1) Sale/transfer, (2) Remodel/permit >$100,000, (3) Any change in water meter size — increasing or decreasing the meter triggers sewer lateral compliance
- (1) Sale or transfer of property
- (2) Remodeling/building permit over $100,000
- (3) Any change in water meter size — increasing or decreasing the meter triggers sewer lateral compliance — EBMUD PSL ordinance governs, same three triggers as main EBMUD program
- Stege no-interest deferred-payment loan may be available; the district homepage advertises up to $30,000, while some subpages still display $10,000 — verify before applying
◯ Negotiable / deposit option
Rodeo Unincorporated ◯ Required at transfer — approved extension may allow up to 6 months ✔ Grant 📜 Ordinance Gas Shutoff Valve ▼
- RSD Ordinance No. 08-101 (adopted August 11 2008): Certificate of Compliance required prior to sale
- CCTV inspection required — CCTV must start at District mainline pulling back toward home, max 30 ft/min, must have counter
- 5-second stop required at any defect (broken sections, root intrusion, misaligned joints)
- CCTV submitted as CD, flash drive, or downloadable video link — no video of video accepted
- Certificate not issued until all District requirements satisfied — review takes 2-3 business days
- Extension up to 6 months available if repairs needed — send written request to District Manager signed by buyer and real estate agent
- Building Sewer Replacement Grant Program (BSRGP) available for eligible property owners
- (1) Transfer of title / sale of property
- (2) Major building permit
◯ Required at transfer — approved extension may allow up to 6 months
Remodel threshold: $5,000 when gas work is involved; $15,000 for other qualifying remodel work.
County Requirements
This community is an unincorporated area governed primarily by Contra Costa County. Property compliance requirements may be administered by the County and the applicable sewer or sanitary district rather than by a city government.
San Pablo ◯ Negotiable / deposit option ⚡ Apply before work ✔ Grant 📜 Ordinance ▼
- Certificate of Compliance required for property transfer in the WCW service area
- Must be in WCWD service area
- CCTV inspection and estimates required
- Lateral fails inspection or is scheduled for replacement
- Pre-approval required before any work begins
◯ Negotiable / deposit option
San Ramon (Central San Service Area) ◯ Negotiable / deposit option ⚡ Apply before work 💰 Loan 📜 Ordinance ▼
- Verify whether Central San or DSRSD serves your address
- Lateral replacement needed
- Financing application before construction
◯ Negotiable / deposit option
San Ramon (DSRSD / Southern San Ramon) ◯ Negotiable / deposit option ⚡ Apply before work 📜 Ordinance ▼
- Verify whether Central San or DSRSD serves your address
- Lateral replacement needed
- Financing application before construction
◯ Negotiable / deposit option
Walnut Creek ◯ Negotiable / deposit option ⚡ Apply before work 💰 Loan 📜 Ordinance ▼
- Eligible replacement or shared lateral
- Repaid through annual property tax bill
- Lateral replacement needed
- Financing application before construction
◯ Negotiable / deposit option
Marin County 18 cities ▼
Alto / Almonte / Homestead Valley / Richardson Bay (SASM unincorporated) ✔ Can transfer to buyer 📜 Ordinance Gas Shutoff Valve ▼
The unincorporated Mill Valley area is served by multiple separate SASM member districts (Alto, Almonte, Homestead Valley, Richardson Bay, Tamalpais Community Services District). Two properties marketed as 'Mill Valley' may follow different procedures. Always verify specific district by parcel address.
- SASM model ordinance adopted by all six SASM member agencies including Alto SD, Almonte SD, Homestead Valley SD, and Richardson Bay SD
- Same triggers and requirements as City of Mill Valley: sale, remodel $50k+, road/main work
- 180-day grace period after close to complete repairs — inspection required before close
- Verify which specific district serves your address — unincorporated Mill Valley area is fragmented across multiple SASM member districts
- Contact SASM: (415) 388-6393 or individual district to confirm serving agency
- (1) Sale or resale of property
- (2) Remodel valued at $50,000 or more within 3 years
- (3) Sewer main rehabilitation or road resurfacing project on your street
✔ Can transfer to buyer
Remodel threshold: No dollar amount listed; applies to qualifying substantial remodel work.
Belvedere ◯ Negotiable / deposit option ⚡ Apply before work ⚠ Verify 📜 Ordinance ▼
Verify current program status with SD5 / SASM before publishing.
- Verify SASM membership by parcel
- SD5 Ordinance 2014-02a may apply: triggers include sale, remodel >$50k, road resurfacing
- Buying or selling a property
- Remodeling or building work valued over $50,000 within a 3-year period
- Sewer main rehabilitation or road resurfacing project in vicinity
◯ Negotiable / deposit option
Corte Madera ✔ Can transfer to buyer 📜 Ordinance Gas Shutoff Valve ▼
- POS ordinance (Ord. No. 45, 2018): inspection required at sale/transfer of title
- Also triggered by: building permit ≥$50,000 cumulative over 3 years, ADU, water meter size change, fire sprinkler installation, fixture count change
- Also triggered by: sewer overflow/malfunction, sewer main improvement or road paving nearby
- 180 days to comply from close of escrow OR date of Notice to Repair, whichever comes first
- Shared laterals: if one property is triggered, all properties sharing that lateral are also triggered
- No known grant or loan program
- (1) Sale or transfer of property title
- (2) Building permit ≥$50,000 cumulative over 3 years
- (3) ADU construction or legalization
- (4) Water meter size change
- (5) Fire sprinkler installation
- (6) Fixture count change
- (7) District Manager request
- (8) Sewage overflow, malfunction, or public health threat
- (9) Adjacent sewer main improvement or road paving (Capital Improvement Project)
✔ Can transfer to buyer
Remodel threshold: No dollar amount listed; applies to substantial remodel work.
Fairfax ✔ Can transfer to buyer ⚡ Apply before work ✔ Grant 💰 Loan 📜 Ordinance Gas Shutoff Valve ▼
- You may only apply for one program (grant OR loan)
- RVSD compliance certificate required at sale, remodel >$75k, or bathroom addition
- 90 days from close of escrow to complete if deferred
- Sale / transfer of property (buyer or seller coordinates test upon listing)
- Remodeling valued at $75,000 or greater (within 3-year period)
- Addition of a bathroom
✔ Can transfer to buyer
Remodel threshold: No dollar amount listed; applies to substantial remodel work.
Kentfield ✔ Can transfer to buyer ⚡ Apply before work ✔ Grant 💰 Loan 📜 Ordinance Gas Shutoff Valve ▼
- You may only apply for one program (grant OR loan)
- RVSD compliance certificate required
- 90 days from close of escrow if deferred
- Sale / transfer of property (buyer or seller coordinates test upon listing)
- Remodeling valued at $75,000 or greater (within 3-year period)
- Addition of a bathroom
✔ Can transfer to buyer
Remodel threshold: No dollar amount listed; applies to qualifying substantial remodel work.
Larkspur ✔ Can transfer to buyer ⚡ Apply before work ⚠ Verify 📜 Ordinance ▼
- Parts of Larkspur served by RVSD — RVSD ordinance applies in those areas
- Verify your address before assuming program or ordinance applies
- Sale / transfer of property (buyer or seller coordinates test upon listing)
- Remodeling valued at $75,000 or greater (within 3-year period)
- Addition of a bathroom
✔ Can transfer to buyer
Marin City ✖ Must complete before close ⚡ Apply before work ✔ Grant 📜 Ordinance Gas Shutoff Valve ▼
- Property must be within SMCSD service area
- Compliance certificate required at transfer of title
- CCTV inspection required via certified plumber using Go Forward Lateral software (no other method accepted)
- Compliance triggers: title transfer, change in customer, remodel/construction >$50,000, or change in use
- Transfer of title (sale)
- Remodeling / change in use — verify threshold with district
✖ Must complete before close
Remodel threshold: No dollar amount listed; applies to qualifying substantial remodel work.
Mill Valley ⚡ Apply before work ⚠ Verify ▼
Source document is from 2022. Verify current status with SASM before publishing.
- Verify active program year with SASM directly
- Income qualification may apply for additional assistance
Mill Valley (City — SASM area) ✔ Can transfer to buyer 📜 Ordinance ▼
- SASM model ordinance effective June 2 2015 in the City of Mill Valley
- Triggers: (1) sale/resale of property, (2) remodel valued at $50,000+ within 3 years, (3) sewer main or road resurfacing project on your street
- 180-day grace period — inspection required before sale is finalized but repairs may be completed after close of escrow
- Inspection report submitted to City/SASM before close
- Exemption: lateral originally installed or fully replaced within last 20 years, or repaired within last 3 years
- Contact City of Mill Valley Public Works: (415) 388-4033
- (1) Sale or resale of property
- (2) Remodel valued at $50,000 or more within 3 years
- (3) Sewer main rehabilitation or road resurfacing project on your street
✔ Can transfer to buyer
Novato ◯ Negotiable / deposit option ⚡ Apply before work ✔ Grant 📜 Ordinance ▼
- Entire lateral replacement only — no partial repairs
- 3 contractor bids required
- Approval letter before work begins
- First-come by fiscal year
- Building permit for new connection or significant work
- Verify POS trigger with district — grant requires pre-approval before any work
◯ Negotiable / deposit option
Ross ✖ Must complete before close ✔ Grant 💰 Loan 📜 Ordinance ▼
- RVSD Ordinance No. 66 (adopted June 2014, effective January 1 2015 for property sales)
- Triggers: sale/purchase of property, remodel exceeding $75,000, adding a bathroom
- Repairs must be complete within 90 days from the close of escrow
- RVSD service area includes Town of Ross (confirmed on rvsd.org)
- Same program and requirements as Fairfax, San Anselmo, Larkspur, Kentfield, Sleepy Hollow
- (1) Buying or selling a property
- (2) Remodeling in excess of $75,000
- (3) Adding a bathroom
✖ Must complete before close
San Anselmo ✔ Can transfer to buyer ⚡ Apply before work ✔ Grant 💰 Loan 📜 Ordinance Gas Shutoff Valve ▼
- You may only apply for one program (grant OR loan)
- RVSD compliance certificate required
- 90 days from close of escrow if deferred
- Sale / transfer of property (buyer or seller coordinates test upon listing)
- Remodeling valued at $75,000 or greater (within 3-year period)
- Addition of a bathroom
✔ Can transfer to buyer
Remodel threshold: No dollar amount listed; applies to substantial remodel work.
San Rafael (Central City — SRSD area) — No Program ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
- San Rafael Sanitation District explicitly states: no sewer lateral inspection is required prior to the sale of a property
- Verify your address with SRSD to confirm service area — portions of San Rafael are served by RVSD (central/south) or LGVSD (north Terra Linda area) instead
- SRSD serves the central city of San Rafael
San Rafael (Central/South — RVSD areas) ✔ Can transfer to buyer ⚡ Apply before work ✔ Grant 💰 Loan 📜 Ordinance ▼
- RVSD compliance certificate required at sale, remodel >$75k, or bathroom addition
- You may only apply for one program (grant OR loan)
- Verify your address is in RVSD service area
- Sale / transfer of property (buyer or seller coordinates test upon listing)
- Remodeling valued at $75,000 or greater (within 3-year period)
- Addition of a bathroom
✔ Can transfer to buyer
San Rafael (North — LGVSD: Terra Linda, Marinwood, Lucas Valley, Santa Venetia) ✖ Must complete before close ⚡ Apply before work 💰 Loan 📜 Ordinance ▼
- POS ordinance: inspection required at sale if home valued at $30,000+
- Building permit of $30,000+ also triggers inspection
- Standard review: 10 business days ($250 fee); expedited: 5 business days ($500)
- Loan: LGVSD pays contractor directly; repaid via semi-annual property tax bill
- PACP-certified inspector required
- Sale of property valued at $30,000 or greater
- Building permit valued at $30,000 or greater
- Sewer lateral work requiring a permit
✖ Must complete before close
Sausalito ✖ Must complete before close ⚡ Apply before work ✔ Grant 📜 Ordinance ▼
- Property must be within SMCSD service area
- As of August 22 2025, SMCSD now owns and operates City of Sausalito sewer collection system — all compliance submissions now go to SMCSD directly (not City of Sausalito)
- CCTV inspection required
- Transfer of title (sale)
- Remodeling / change in use — verify threshold with district
✖ Must complete before close
Sleepy Hollow ✔ Can transfer to buyer ⚡ Apply before work ✔ Grant 💰 Loan 📜 Ordinance Gas Shutoff Valve ▼
- You may only apply for one program (grant OR loan)
- RVSD compliance certificate required
- 90 days from close of escrow if deferred
- Sale / transfer of property (buyer or seller coordinates test upon listing)
- Remodeling valued at $75,000 or greater (within 3-year period)
- Addition of a bathroom
✔ Can transfer to buyer
Remodel threshold: No dollar amount listed; applies to qualifying substantial remodel work.
Tiburon ◯ Negotiable / deposit option ⚡ Apply before work ⚠ Verify 📜 Ordinance Gas Shutoff Valve ▼
Address-level verification required.
- SD5 Ordinance 2014-02a triggers: sale, remodel >$50k, road/main project in vicinity
- Member agency participation varies — verify by address
- Buying or selling a property
- Remodeling or building work valued over $50,000 within a 3-year period
- Sewer main rehabilitation or road resurfacing project in vicinity
◯ Negotiable / deposit option
Remodel threshold: No dollar amount listed; applies to substantial remodel work.
San Francisco County 1 city ▼
San Francisco — No Program SidewalkWater ▼
No confirmed POS ordinance as of July 2026. SFPUC planned one in 2020 but current adoption status is unconfirmed. Agents should verify directly with SFPUC before advising clients.
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
- SFPUC manages the City and County of San Francisco sewer system — 30,000+ acres of service area
- Lower laterals (sewer main to curb line): SFPUC replaces if structural defects are found during SFPUC projects
- Upper laterals (curb line to building): property owner responsibility for all maintenance, repair, and replacement
- No mandatory POS inspection ordinance confirmed as of July 2026 — SFPUC noted in 2020 a sewer lateral ordinance was 'in the planning stage'
- Triggers for permit-required work: any new lateral installation, relocation, or modification; construction projects in the public right-of-way; laterals exceeding standard 6-inch diameter require SFPUC referral
- CCTV required for all lateral work — personnel must be NASSCO PACP certified; camera speed max 0.5 ft/sec; footage counter required
- Flood zone notification: SFPUC worked with Board of Supervisors on ordinance requiring notification at point of sale for properties in 100-year flood zone (separate from sewer lateral)
- Optional sewer lateral insurance: SFPUC partnered with American Water Resources (AWR) for optional protection plans — visit sfpuc.gov/learning/emergency-preparedness/sewer-laterals
- Grants available: SFPUC Floodwater Grant Program — reimbursement for backwater valve installation
- Contact SFPUC 24-hour: (415) 701-2311 or 3-1-1
San Mateo County 20 cities ▼
Atherton — No Program ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
Belmont — No Program ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
Brisbane — No Program ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
Burlingame ✖ Must complete before close 📜 Ordinance ▼
- POS ordinance: buildings >25 years old must pass pressure/air test before title transfer
- All repair and replacement work must be completed and approved before title transfer — no deferral
- Transfer of title (sale) for buildings more than 25 years old
- Any remodel or addition with a building permit (lateral must be in compliance)
✖ Must complete before close
Colma — No Program ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
- No confirmed POS sewer lateral inspection ordinance for Colma as of July 2026
- Colma is served by the North San Mateo County Sanitation District for treatment
- Verify current requirements with City of Colma Public Works: (650) 997-8300
- Note: Colma has a very small residential population — most land is cemeteries
Daly City — No Program ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
East Palo Alto — No Program ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
- No confirmed POS sewer lateral inspection ordinance for East Palo Alto as of July 2026
- Wastewater is treated at the Palo Alto Regional Water Quality Control Plant
- Verify current requirements with East Palo Alto Public Works: (650) 853-3100
Foster City — No Program ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
Half Moon Bay — No Program ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
Hillsborough ✖ Must complete before close 📜 Ordinance ▼
- POS ordinance (adopted 2012): CCTV video inspection required before sale
- Work must be completed before close of escrow — no deferral to buyer
- Exemption if lateral connects directly in street right-of-way
- Sale or transfer of property
- Remodeling (verify threshold with town)
✖ Must complete before close
Menlo Park — No Program SidewalkWater ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
Millbrae ✖ Must complete before close 📜 Ordinance ▼
- POS ordinance (Municipal Code 8.20.450): CCTV video inspection required before close of escrow
- Exempt if tested and passed within last 5 years or lateral fully replaced within last 20 years
- Work must be completed before title transfer
- Transfer of ownership (close of escrow)
- Remodeling — verify threshold with city
✖ Must complete before close
Pacifica ✖ Must complete before close ✔ Grant 📜 Ordinance ▼
2026–27 program is open beginning July 1 2026. Apply for the City inspection first; only City-inspected qualifying laterals are eligible for the $2,000 reimbursement grant.
- 2026–27 program runs July 1 2026 through June 30 2027, or until 100 laterals are replaced
- Apply for the free City inspection before replacement; the lateral must be inspected through the program and found eligible by City staff
- Eligible property must generally be a private single-family primary residence or qualifying nonprofit transitional housing
- Property cannot need a Lateral Compliance Certificate for a sale, major remodel, new plumbing fixtures/drains, or other trigger within the next 2 years
- Grant is reimbursement up to $2,000 after permitted replacement and proof the contractor was paid in full
- Transfer of property ownership
- Remodel or addition costing $50,000 or more
- Adding any plumbing fixtures or drains
- Changing water service, including meter-size change or adding a second meter
✖ Must complete before close
Portola Valley — No Program ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
- No confirmed POS sewer lateral inspection ordinance for Portola Valley as of July 2026
- West Bay Sanitary District serves Portola Valley and Woodside
- Verify current requirements with West Bay Sanitary District: (650) 321-0384
Redwood City — No Program ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
San Bruno ✖ Must complete before close 📜 Ordinance ▼
- POS ordinance (effective May 8 2015): sewer lateral inspection required before sale
- Pressure test method (similar to Burlingame / Pacifica)
- Work must be completed before close of escrow
- Sale or transfer of property
✖ Must complete before close
San Carlos — No Program ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
San Mateo ◯ Negotiable / deposit option ⚡ Apply before work ⏸ Closed 📜 Ordinance ▼
Cost Sharing Program is currently closed for FY 2025/26. Check back June/July 2026 for new fiscal year.
- POS ordinance (Municipal Code 7.38.432, effective Dec 1 2020): 4 triggers — sale, permit, remodel, or sewer main work nearby
- Inspection report required (not a certificate of compliance)
- Cost sharing program: non-retroactive, accepted before work begins
- Seller must provide inspection report; buyer must schedule if not done
- Sale or transfer of property
- Building permit issued
- Remodeling — verify threshold with city
- Sewer main work or road resurfacing in vicinity
◯ Negotiable / deposit option
South San Francisco ✖ Must complete before close 📜 Ordinance ▼
- POS ordinance (effective June 21 2022): sewer lateral video inspection required before sale
- Multi-unit residential buildings sharing a lateral are exempt
- Work must be completed before close of escrow
- Sale or transfer of property (purchase and sale agreements entered after June 21 2022)
✖ Must complete before close
Woodside — No Program ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
- No confirmed POS sewer lateral inspection ordinance for Woodside as of July 2026
- West Bay Sanitary District serves both Woodside and Portola Valley
- Verify current requirements with West Bay Sanitary District: (650) 321-0384
- Note: Woodside is largely on large-lot estate properties, some with septic systems — verify connection to public sewer
Solano County 8 cities ▼
Benicia — No Program ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
Dixon — No Program ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
Fairfield — No Program ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
Rio Vista — No Program ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
Suisun City — No Program ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
Vacaville — No Program Sidewalk ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
Vallejo ✖ Must complete before close ✔ Grant 📜 Ordinance ▼
Reimbursement program — work must be completed first, then apply. Inspection is required at sale but repair is not mandatory unless lateral is failing.
- POS ordinance effective July 1 2025 (Ord. 2025-73): inspection required at sale if lateral is 10+ years old
- Licensed contractor must perform full CCTV inspection
- Inspection report submitted to district 10+ days before close of escrow
- Repair/replacement is NOT required — inspection only (unless failing)
- Up to $3,500 reimbursement available if owner chooses to repair/replace
- Exempt: condominiums and mobile homes within a park; laterals installed/replaced under District permit within last 10 years
- Sale or transfer of property where lateral is 10 or more years old since construction or replacement
✖ Must complete before close
Winters — No Program ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
Sonoma County 9 cities ▼
Cloverdale ⚡ Apply before work 💰 Loan ▼
- Income-qualified owner-occupants only
- Not a dedicated sewer lateral program
Cotati ⚡ Apply before work 💰 Loan ▼
- Income-qualified owner-occupants only
- Not a dedicated sewer lateral program
Healdsburg ⚡ Apply before work 💰 Loan ▼
- Income-qualified owner-occupants only
- Not a dedicated sewer lateral program
Petaluma ⚡ Apply before work ✔ Grant ▼
- Complete replacement or repair eliminating I&I
- Based on approved cost
- Verify annual funding availability
Rohnert Park ⚡ Apply before work 💰 Loan ▼
- Income-qualified owner-occupants only
- Not a dedicated sewer lateral program
Santa Rosa — No Program Sidewalk ▼
No public grant, loan, or financing program found. No POS ordinance confirmed. Verify directly with the governing agency.
Sebastopol ⚡ Apply before work ✔ Grant ▼
- Private sewer lateral replacement
- Apply before work begins
- Verify current year funding with city — apply before work begins
Sonoma ⚡ Apply before work 💰 Loan ▼
- Income-qualified owner-occupants only
- Not a dedicated sewer lateral program
- IMPORTANT: Sonoma Valley County Sanitation District (operated by Sonoma Water) has an active ordinance requiring laterals on properties 30 years or older to be inspected and repaired if necessary — NOT a POS requirement but may affect older properties
- Contact Sonoma Water for current inspection status of your property
Windsor ⚡ Apply before work ⚠ Verify ▼
Verify current fiscal year funding with town before publishing.
- Affected properties per town program
- Verify current year funding with town
All confirmed sanitary districts and governing agencies — compliance triggers, test methods, escrow rules, and direct links. Click any county to expand, then the district.
30 agencies across 7 counties
Alameda County 6 agencies ▼
Castro Valley Sanitary District (CVSan) Grant Castro Valley Sanitary District 📜 Ordinance ◯ Negotiable / deposit option ▼
- Grant application trigger: lateral fails video/smoke test or physically requires replacement
- No POS ordinance requiring all property sales to test
◯ Negotiable / deposit option
City of Berkeley GrantLoan City of Berkeley Public Works 📜 Ordinance ◯ Negotiable / deposit option ▼
- (1) Sale or transfer of property
- (2) Building permit for major construction projects (threshold varies — verify with city)
- (3) City finds that the PSL may be a public nuisance
- (4) Property owner voluntarily elects to repair or replace PSL
- Note: Berkeley manages its own independent program — NOT the EBMUD regional program. Any increase or decrease in water meter size is an EBMUD trigger, not a separate Berkeley trigger.
◯ Negotiable / deposit option
Dublin San Ramon Services District (DSRSD) Loan Dublin San Ramon Services District 📜 Ordinance — No POS ▼
- NO point-of-sale inspection requirement as of July 2026
- Sewer laterals are considered privately owned — repairs are the property owner's responsibility
- A Limited Construction Permit from DSRSD required for any lateral repair or replacement
- Triggered by: new construction, connection changes, or ADU additions requiring new service
EBMUD Regional PSL Area East Bay Municipal Utility District (EBMUD) 📜 Ordinance ◯ Negotiable / deposit option ▼
- (1) Sale or transfer of property (escrow)
- (2) Building or remodeling permit valued over $100,000
- (3) Any change in water meter size — increasing or decreasing the meter triggers sewer lateral compliance — any one of these three events triggers the compliance requirement
- Alameda and Albany: upper lateral only (building to curbside cleanout). All other EBMUD cities: full lateral (upper and lower, building to public sewer main)
- Voluntary compliance also available at any time
◯ Negotiable / deposit option
Oro Loma Sanitary District GrantLoan Oro Loma Sanitary District 📜 Ordinance ◯ Negotiable / deposit option ▼
- (1) Transfer of property title / sale — inspection report required before or within 30 days after transfer
- (2) Building permit ≥$50,000 (cumulative over 3 years)
- (3) ADU (accessory dwelling unit) construction or addition of another building unit
- (4) Bathroom addition
- (5) 25% or more increase in building square footage
- (6) Significant change to building plumbing system
- Also triggered by: overflow/malfunction, lateral failure, public health threat
◯ Negotiable / deposit option
Union Sanitary District (USD) Union Sanitary District 📜 Ordinance — No POS ▼
- No POS (point of sale) inspection requirement — USD does not require sewer lateral certification for property sales
- Triggered by: new construction, connection, or major repair requiring a permit
- Ordinance No. 34 establishes that each property owner is responsible for maintaining and repairing their own sewer lateral from the house to the point of connection with the public main — including the portion beneath the sidewalk and street
Contra Costa County 8 agencies ▼
Central San Financing Area GrantLoan Central Contra Costa Sanitary District (Central San) 📜 Ordinance ◯ Negotiable / deposit option ▼
- Lateral replacement needed
- Financing application before construction
◯ Negotiable / deposit option
Crockett / Port Costa — Crockett Community Services District Crockett Community Services District (CCSD) 📜 Ordinance ✖ Must complete before close ▼
- (1) Transfer of title / sale of property
- (2) Major building permit
✖ Must complete before close
Delta Diablo Sanitation District Delta Diablo Sanitation District 📜 Ordinance — No POS ▼
- NO point-of-sale inspection requirement as of July 2026 — confirmed by District FAQ
- Lateral permits required for: new construction, connection changes, or repair/replacement work
- District website states: "The District does not require sewer lateral certifications for property sales"
Ironhouse Sanitary District — Oakley / Bethel Island Ironhouse Sanitary District (ISD) 📜 Ordinance — No POS ▼
- No confirmed POS inspection requirement at sale as of July 2026 — verify current status with ISD
- Ordinance No. 65 establishes private sewer lateral maintenance, inspection, construction, and replacement requirements
- Triggered by: new construction, connection changes, repair/replacement requiring District permit
Mountain View Sanitary District (MVSD) — Martinez NE Loan Mountain View Sanitary District (MVSD) 📜 Ordinance — No POS ▼
- No confirmed POS inspection requirement as of July 2026
- MVSD does NOT own or maintain side sewers — property owner responsible from home to point of connection with public main
- Triggered by: any repair or replacement requiring a permit
Rodeo — Rodeo Sanitary District GrantLoan Rodeo Sanitary District (RSD) 📜 Ordinance ✖ Must complete before close ▼
- (1) Transfer of title / sale of property — Certificate of Compliance required
- (2) Major building permit
✖ Must complete before close
Stege Sanitary District GrantLoan Stege Sanitary District 📜 Ordinance ◯ Negotiable / deposit option ▼
- (1) Sale or transfer of property
- (2) Remodeling/building permit over $100,000
- (3) Any change in water meter size — increasing or decreasing the meter triggers sewer lateral compliance — EBMUD PSL ordinance governs, same three triggers as main EBMUD program
- Stege no-interest loan (up to $10,000) available to help cover compliance costs
◯ Negotiable / deposit option
West County Wastewater District (WCWD) — PIPES Program Grant West County Wastewater District 📜 Ordinance ◯ Negotiable / deposit option ▼
- Lateral fails inspection or is scheduled for replacement
- Pre-approval required before any work begins
◯ Negotiable / deposit option
Marin County 7 agencies ▼
Corte Madera — Sanitary District No. 2 (SD2) Sanitary District No. 2 (SD2) 📜 Ordinance ✔ Can transfer to buyer ▼
- (1) Sale or transfer of property title
- (2) Building permit valued at ≥$50,000 cumulative over a 3-year period
- (3) ADU construction or legalization
- (4) Water meter size change
- (5) Fire sprinkler installation
- (6) Fixture count change
- (7) District Manager request
- (8) Sewage overflow, malfunction, or public health threat
- (9) Adjacent sewer main improvement or overlying road paving (Capital Improvement Project)
✔ Can transfer to buyer
Las Gallinas Valley Sanitary District (LGVSD) — North San Rafael GrantLoan Las Gallinas Valley Sanitary District 📜 Ordinance ✖ Must complete before close ▼
- Sale of property valued at $30,000 or greater
- Building permit valued at $30,000 or greater
- Sewer lateral work requiring a permit
✖ Must complete before close
Novato Sanitary District Grant Novato Sanitary District 📜 Ordinance ◯ Negotiable / deposit option ▼
- Building permit for new connection or significant work
- Verify POS trigger with district — grant requires pre-approval before any work
◯ Negotiable / deposit option
Ross Valley Sanitary District (RVSD) GrantLoan Ross Valley Sanitary District 📜 Ordinance ✔ Can transfer to buyer ▼
- Sale / transfer of property (buyer or seller coordinates test upon listing)
- Remodeling valued at $75,000 or greater (within 3-year period)
- Addition of a bathroom
✔ Can transfer to buyer
Sanitary District No. 5 (SD5) — Tiburon / Belvedere area Sanitary District No. 5 of Marin County 📜 Ordinance ◯ Negotiable / deposit option ▼
- Buying or selling a property
- Remodeling or building work valued over $50,000 within a 3-year period
- Sewer main rehabilitation or road resurfacing project in vicinity
◯ Negotiable / deposit option
SASM — Sewerage Agency of Southern Marin (Mill Valley + 5 Districts) GrantLoan Sewerage Agency of Southern Marin (SASM) 📜 Ordinance ✔ Can transfer to buyer ▼
- (1) Sale or resale of property
- (2) Remodel or improvement valued at $50,000 or more within any 3-year period
- (3) Sewer main rehabilitation or road resurfacing project on your street
✔ Can transfer to buyer
Sausalito / Marin City (SMCSD) GrantLoan Sausalito-Marin City Sanitary District 📜 Ordinance ✖ Must complete before close ▼
- Transfer of title (sale)
- Remodeling / change in use — verify threshold with district
✖ Must complete before close
San Francisco County 1 agency ▼
San Francisco (SFPUC) Grant San Francisco Public Utilities Commission (SFPUC) 📜 Ordinance — No POS ▼
- No confirmed POS trigger as of July 2026
- Permit required for: any new lateral installation, relocation, or modification of lower sewer lateral
- Laterals exceeding standard 6-inch diameter require SFPUC referral
- SFPUC replaces lower laterals (sewer main to curb) if structural defects are found during City sewer projects
San Mateo County 7 agencies ▼
City of Burlingame City of Burlingame Public Works 📜 Ordinance ✖ Must complete before close ▼
- Transfer of title (sale) for buildings more than 25 years old
- Any remodel or addition with a building permit (lateral must be in compliance)
✖ Must complete before close
City of Millbrae City of Millbrae Public Works 📜 Ordinance ✖ Must complete before close ▼
- Transfer of ownership (close of escrow)
- Remodeling — verify threshold with city
✖ Must complete before close
City of Pacifica Grant City of Pacifica Public Works / Wastewater Treatment 📜 Ordinance ✖ Must complete before close ▼
- Sale or transfer of property
- Remodeling — verify threshold with city
✖ Must complete before close
City of San Bruno GrantLoan City of San Bruno Public Works 📜 Ordinance ✖ Must complete before close ▼
- Sale or transfer of property
✖ Must complete before close
City of San Mateo GrantLoan City of San Mateo Public Works 📜 Ordinance ◯ Negotiable / deposit option ▼
- Sale or transfer of property
- Building permit issued
- Remodeling — verify threshold with city
- Sewer main work or road resurfacing in vicinity
◯ Negotiable / deposit option
City of South San Francisco Grant City of South San Francisco Public Works 📜 Ordinance ✖ Must complete before close ▼
- Sale or transfer of property (purchase and sale agreements entered after June 21 2022)
✖ Must complete before close
Town of Hillsborough Town of Hillsborough Public Works 📜 Ordinance ✖ Must complete before close ▼
- Sale or transfer of property
- Remodeling (verify threshold with town)
✖ Must complete before close
Solano County 1 agency ▼
Vallejo (Vallejo Flood and Wastewater District) GrantLoan Vallejo Flood and Wastewater District 📜 Ordinance ✖ Must complete before close ▼
- Sale or transfer of property where lateral is 10 or more years old since construction or replacement
✖ Must complete before close
Apply Early
Many programs require approval before construction begins.
Limited Funding
Programs often operate on a first-come, first-served basis.
Annual Budgets
Funding levels may change from year to year.
Documentation Matters
Permit records, inspections and contractor estimates may be required.